Installation guidelines:
1. Install perimeter and base isolation strips (CDM-PERIMETERSTRIP);
2. Fix CDM-WALL-T batten to the wall at approximately 600mm centres to match the joints of the first layer of plasterboard or wall board;
3. Install low density mineral fibre between battens;
4. Fix first layer of plasterboard or wall board to CDM-WALL-T battens ensuring that it butts tightly to the perimeter and base isolation strips;
5. Fix damping sheet and then additional layers of plasterboard (fixings must not touch supporting wall);
6. Skim plaster and paint to finish.